Byrne Consultants was responsible for the design and construction certification of all civil works on the site. This included setting floor levels, design of building pads, design of all roadworks and carparks, storm water drainage and external paving. Also included significant erosion and sediment control devices.
In 2016 Byrne Consultants designed the earthworks for 3 waste water treatment dams.