The project brief also included developing a premier grade AFL oval that matched the size of the MCG.
The nature of this project presented some unique challenges, requiring detailed understanding of legal and regulatory requirements in relation to access and mobility standards for children and adolescents.
This project was required to be completed in time for the start of the school year.
Byrne Consultants is also provided assistance to the Dept. of Infrastructure project manager during the construction phase.
In 2016 Byrne Consultants designed the earthworks for 3 waste water treatment dams.
After assessing the existing infrastructure, it was decided that existing services were unusable and would be abandoned.
For this project Byrne Consultants designed and constructed industrial pavements over very low strength subgrade.
A notable feature of this design was the need to match into existing buildings and facilities while maintaining disabled access throughout the boulevard.
Byrne Consultants worked very closely with the contractor and other consultants to provide tender documentation and detailed design documentation in a very tight timeframe.
The client requested that this project be fast tracked so that the tender could be left with sufficient time to allow completion of construction before the opening of the new Darwin Middle School.
The signalized intersection was designed for a double diamond phasing configuration and allowed for multiple turning lanes and road train movements on all legs.