Girraween Road Roundabout and Road Realignment  and Coolalinga Bus Park and  Ride Facility.

Girraween Road Roundabout and Road Realignment and Coolalinga Bus Park and Ride Facility.

Client: Department of Infrastructure

Period: 2010

Scope of work:

We developed layouts for DCI approval, followed by Design and Documentation of the $2.3M roundabout and road realignment and $1.5M Park and Ride facility. Scope included roadworks, storm water drainage, traffic signals, electrical reticulation, street lighting and miscellaneous service relocations. Byrne Consultants also provided the Dept. of Infrastructure project manager with assistance and advice for the duration of the construction phase.

Project Highlights:

The Coolalinga Park and Ride facility was commissioned three weeks before the Christmas break. The client required the civil works to be completed two weeks after the break. Byrne Consultants undertook the development of layouts for approval and followed up with detailed design and documentation, completing the civil works within the required time frame.

Categories

Roads and Intersections

A culture of hard work,honesty and client focus. The satisfaction of a job well done.

REACH US

Email : info@byrneconsultants.com.au

Phone : +61 8 8947 2476

Working Hours : Mon-Fri : 8 AM - 5 PM

Location : T8 | Ground Floor | Winnellie Point, 60 Winnellie Road | Winnellie | NT 0820