Magpies Oval/Grandstand  –  Palmerston

Magpies Oval/Grandstand – Palmerston

Clients: Halikos Construction Pty Ltd and Dept. of Infrastructure

Period: 2011

Scope of work: 

We were engaged as Civil Consultants for Halikos's Design and Construct project. Byrne Consultants role included design and documentation of all civil works to do with the grandstand development, oval grading and car park extension.

Project Highlights:

The project brief also included developing a premier grade AFL oval that matched the size of the MCG. The requirements for the oval included substantial subsoil drainage, comprising subsoil drainage pipes in a herringbone configuration under aggregate drainage layer and two graded sand layers and a top layer containing growing medium and grass.

We relocated a major existing storm-water pipeline from under the grandstand and dealt with and provided drainage for the unexpectedly high groundwater in the vicinity of the grand stand.

Categories

Buildings and Facilities

A culture of hard work,honesty and client focus. The satisfaction of a job well done.

REACH US

Email : info@byrneconsultants.com.au

Phone : +61 8 8947 2476

Working Hours : Mon-Fri : 8 AM - 5 PM

Location : T8 | Ground Floor | Winnellie Point, 60 Winnellie Road | Winnellie | NT 0820