Client: Halikos Pty Ltd. And Defence
Period: 2011
Scope of work:
Civil Consultant responsible for design and documentation of the subdivision and all services. Byrne Consultants was responsible for the design, documentation, approvals and construction certification of the subdivision.
Project Highlights:
After assessing the existing infrastructure, it was decided that existing services were unusable and would be abandoned. This required the complete redesign of site infrastructure for 97 lots. Byrne Consultants’ role included the re-grading of the site, upgrading of storm water drainage, Sewer Reticulation, Sewer pump station and Water Reticulation to current PWC standards.

A culture of hard work,honesty and client focus. The satisfaction of a job well done.
Email : info@byrneconsultants.com.au
Phone : +61 8 8947 2476
Working Hours : Mon-Fri : 8 AM - 5 PM
Location : T8 | Ground Floor | Winnellie Point, 60 Winnellie Road | Winnellie | NT 0820